Subscribe to the Savy & Sons periodic email letters and stay up to date on new services, recent projects, and blog posts.
You may unsubscribe at any time, and Savy & Sons will not share or sell your contact information with third parties.
VT
A municipal building was experiencing ongoing basement water intrusion and deteriorating underground infrastructure that required immediate attention. Initially, Savy & Sons was engaged to perform trenchless pipe rehabilitation services. However, during the project walkthrough and evaluation phase, it became clear that the underlying issues extended beyond piping alone and required a more comprehensive solution.
Based on our experience in underground infrastructure, water mitigation, and structural restoration, the scope of work expanded to include demolition, concrete restoration, drainage improvements, and water intrusion mitigation. The project ultimately evolved into a fully integrated infrastructure and structural rehabilitation effort completed over a five-month period.
The municipal building’s basement level was experiencing significant water intrusion and infrastructure deterioration. Existing underground piping required rehabilitation, but further investigation revealed additional concerns, including:
The client required a contractor capable of addressing both the underground infrastructure challenges and the structural restoration work, while maintaining safe operations within an active municipal facility.
What began as a trenchless pipelining project expanded into a multi-scope restoration effort. Savy & Sons demonstrated the technical expertise, coordination capabilities, and confidence necessary to manage both infrastructure rehabilitation and structural restoration components.
The integrated scope of work included:
Trenchless Pipelining
Rehabilitation of existing underground piping systems using trenchless methods to restore structural integrity and flow capacity while minimizing disruption to the facility.
Demolition & Concrete Restoration
Selective demolition within the basement level to remove compromised materials, followed by concrete restoration and reconstruction to return the space to functional condition.
Culvert & Drainage Improvements
Excavation and exposure of the existing stone box sewer culvert, cleaning and preparation of the structure, installation of a new 6-inch perforated pipe, and backfilling with clean ¾-inch crushed stone to improve drainage performance and long-term reliability.
Water Intrusion Mitigation
To address active groundwater infiltration, our team implemented targeted grout injection, sewer bypass operations, and additional mitigation measures designed to control water intrusion and protect the building envelope.
The project required careful coordination between trenchless rehabilitation, structural demolition, and drainage system improvements. Work was sequenced to ensure safe operations within the municipal building environment while addressing active water conditions.
By integrating multiple scopes under one contractor, the client benefited from streamlined communication, efficient scheduling, and cohesive execution across infrastructure and structural components.
The five-month restoration project delivered measurable improvements to both the building and its underlying infrastructure.
Key outcomes included:
The project demonstrated Savy & Sons’ ability to move beyond a specialty role and serve as a trusted partner capable of delivering integrated infrastructure and structural restoration solutions.
This municipal building restoration project highlights the value of integrating trenchless infrastructure rehabilitation with structural restoration and water intrusion mitigation. By addressing the root causes of infiltration and coordinating multiple scopes under one team, Savy & Sons provided a comprehensive solution that improved long-term building performance and reliability.
The successful completion of this five-month project reinforces our commitment to delivering efficient, technically sound solutions for complex municipal infrastructure challenges.
We take pride in completing every project with attention to detail, ensuring exceptional results and long-lasting performance.
Our team follows strict safety protocols and industry standards. We use bonded and insured processes to protect your property and infrastructure.
We stand behind our work, delivering consistent results with honesty, reliability, and a 100% satisfaction guarantee.